Case studies
What the Atlas has actually been run on, and what is still on paper. Each page marks results as real or planned.
Noto Peninsula 2024 replay
Integration test, September 2026. 5 of 5 synthetic crisis messages validated, bundled and delivered.
Keeping AI out of dispatch
Design and test of the deterministic gate between an LLM and any action.
Evacuating health-vulnerable people
Planned layer. Field input from health-tech practice, tied to the Noto ICU incident.
Not yet studied: Tohoku 2011, Kumamoto 2016 and Nankai Trough scenarios. The schema supports timeline reconstruction for them; no runs exist yet planned.